PCGPIONX QCAI-POWERED QUALITY CONTROL
AI ENGINEERING QUALITY CONTROL

Smarter Project Review
Decide with evidence.

A multidisciplinary AI review workspace for design coordination, codes, BOQ, space programs and consultant-grade reporting.

AI
QC
BIM
Deep QC Reviewمراجعة جودة عميقة
Code Complianceمطابقة الأكواد
BOQ Reviewمراجعة الكميات
Space Programبرنامج المساحات
BIM Reviewمراجعة النمذجة
Professional Reportتقرير احترافي
ENGINEERING REVIEW DEPARTMENTS

Visual Review Departments / أقسام المراجعة الهندسية

Every department has its own specialist checklist, visual review scope and evidence trail.

1Upload & Project Informationرفع الملفات ومعلومات المشروع
Drop multiple project files hereor choose files from your deviceChunked upload • large-file ready • multi-file cross checking
Contract / RFP / Employer Requirementsمتطلبات العقد / طلب العروض / متطلبات صاحب العمل
Optional but recommended — PIONX builds a requirement matrix and checks what is satisfied, partial, missing, not yet due, or outside the selected scope.
Upload RFP / Contract Requirements / Scope / Deliverable Matrixارفع RFP أو نطاق الأعمال أو مصفوفة المخرجات أو متطلبات صاحب العملMultiple files supported • treated as governing requirements, not design evidence
Future-stage or excluded-discipline requirements will not be marked as design defects. For partial submissions, PIONX will show remaining due deliverables separately as outstanding/incomplete.
Stage Gate Requirementsمتطلبات المرحلة
04
SELECTED PROJECT STAGE / مرحلة المشروع المختارةDesign DevelopmentCoordinated multidisciplinary design review before tender / IFC progression.
ACTIVE REVIEW SCOPE / نطاق المراجعة الفعليAll engineering departmentsOnly selected departments and their confirmed checklist items will be sent to the Deep QC engine.
Items for Confirmation0 checks selected
2Review Lifecycleدورة المراجعة الكاملة
PROJECT REVIEW ROADMAPAll stages are displayed in one continuous horizontal engineering workflow. The selected project stage is highlighted automatically.
3Items for Confirmationالتي تحتاج تأكيد
4Findingsالنتائج المكتشفة
18Critical
32Major
45Minor
12Improve
CriticalStair railing height non-compliant

Evidence, exact location, reference clause and corrective action appear here.

5Code Referenceمرجع الكود
SBC 201 — 10.9.5

Guards and Handrails

PIONX verifies the applicable engineering basis before presenting compliance claims.
6AI Consultant Chatمحادثة المستشار الذكي
Hello. I can explain findings and propose engineering solutions.
Can you suggest a compliant solution?
Yes. I will compare the finding with the selected code basis and cite the relevant clause.
7Professional PDF Reportتقرير PDF احترافي
PIONX QCQUALITY CONTROL REPORTOverall Score84%
PDF is generated automatically after the verification pass and includes findings, evidence, corrective actions, code references, BOQ, space program, checklist, source register and PIONX QC branding.
PIONX PROJECT INTELLIGENCE

Decision Intelligence Center / مركز ذكاء القرار الهندسي

A live pre-review control center that tells you whether the package is ready, what is still missing, and exactly what PIONX will review before you spend review time.

SUBMISSION READINESSPreparing packageAdd project files and confirm the review scope.
0%
REVIEW SCOPE LOCKAll engineering departmentsStage • Code basis • report language
Scope controlled
NEXT DELIVERABLESStage-gate navigator
Choose a project stage to preview required deliverables.
EVIDENCE & REQUIREMENTSNo evidence loadedProject files and RFP/contract requirements are tracked separately.
0Project files0RFP / Contract
PIONX DECISION GATEPackage not ready yetPIONX will flag the exact next action before the engineering review starts.
Ask PIONX
PIONX QC AssistantDiscuss the review, ask engineering questions, or request a report refinement.
Hello. I can explain findings, discuss code basis, and refine the current QC result when requested.